| No | Project Name | Location | Project status | Start Date | End Date | Project Cost | Details |
|---|---|---|---|---|---|---|---|
| 1 | Construction of a booster pump room, installation and setup of the electrical system, and replacement of four booster pump bases, upgrading the central distribution pump station from 75 kW to 136 kW at the central office of the Herat Zone Directorate. | Herat | Completed | 31-10-2024 | 30-12-2024 | AFN 9,340,000.0 | |
| 2 | Replacement of water supply networks in Turkman locality, Arab-e Shalbafan area, and Mujib-ur-Rahman and Milad roads, belonging to the 7th, 14th, and 15th districts of Herat city | Herat | Completed | 13-01-2023 | 27-04-2023 | AFN 6,350,000.0 | |
| 3 | Construction and equipping of chlorine rooms at four production and distribution sites (Kak Nika, Khwaja Ali Moafaq, Ashidai, and Seven Storage Point). | Herat | Completed | 10-10-2024 | 25-11-2024 | AFN 1,870,000.0 | |
| 4 | Solar Power and Chlorination System Project for Qala Fath Wells | Zaranj | Completed | 01-08-2022 | 31-12-2022 | AFN 53,090,622.00 | |
| 5 | Rehabilitation Project of Six Deep Wells in Jalalabad City, Nangarhar Province | Nangarhar | Completed | 12-09-2022 | 16-09-2023 | AFN 14,000,001.00 | |
| 6 | Water Transmission Pipeline Project from Qargha Dam to the 10,000 Cubic Meter Reservoir in Polytechnic Area, Kabul City | Kabul | Completed | 01-12-2022 | 01-12-2023 | AFN 200,000,000.00 | |
| 7 | Deep Well Drilling Project with All Equipment in Different Districts of Kabul City | Kabul | Completed | 01-11-2022 | 11-06-2022 | AFN 52,000,000.00 | |
| 8 | Water Supply Network Completion and Solar-Powered Booster Pump Construction Project in Mehtarlam,Laghman | Laghman | Completed | 04-07-2022 | 03-01-2023 | AFN 14,000,000.00 | |
| 9 | Urban Electricity Connection and Water Supply Network Connection Project in Gardez City,Paktia | Paktia | Completed | 30-10-2022 | 05-12-2022 | AFN 4,489,551.00 | |
| 10 | 9.6 Kilometer Water Supply Network Extension Project in Gardez City, Paktia Province | Paktia | Completed | 18-03-2021 | 18-08-2021 | AFN 8,280,300.00 | |
| 11 | This decentralized wastewater treatment system is intended departments Ministry of Justice | Kabul | Completed | 12-01-2026 | 12-01-2026 | 936,970.00 AF | |
| 12 | decentralized wastewater treatment system is intended for four government departments (Ministry of Telecommunications, Pashtani Bank, Spin Zar Hotel, and Ministry of Information and Culture). | Kabul | Completed | 12-01-2026 | 12-01-2026 | 14,679,101.00 AF | |
| 13 | Charikar City Water Supply Project Inaugurated | Parwan | Completed | 12-01-2026 | 12-01-2026 | USD 30000 | |
| 14 | Kabul Aminabad Water Supply Project | Kabul | Completed | 12-01-2026 | 12-01-2026 | AFN 24,903,924 | |
| 15 | Kabul City Interim Water Supply Project (MTP1) | Kabul | Ongoing | 12-01-2026 | 12-01-2026 | 70 میلیون یورو |